Clients & Testimonials

Client Testimonial

 

MP Filtri – Design & Manufacture of contamination monitors and hydraulic filtration and associated products.

 

MP Filtri had an existing QA system which needed updating but primarily required additional scope to incorporate the manufacture of contamination monitors and associated products.

 

Neil O’Doherty successfully integrated the scope extension together with reviewing our existing QMS. He performed the work to the time frame required, helpful and accommodating at all levels. We achieved our revised certification at first attempt without any issues with SGS Yarsley.

 

We have also approached Neil to help us with installing a hyperlink into our QMS which was his suggestion – to improve navigation around our manual.

 

We would not hesitate in recommending Neil O’Doherty for any associated Quality project work required.

 

 

Phil Keep

Managing Director - MP Filtri UK Ltd.

27.6.07

EaglePeak Consulting

Quality and Environmental Management Systems

Tel:           +44 (0) 845 230 4191

                 +44 (0) 7725 558 225

E-mail:     enquiries@eaglepeakconsulting.co.uk

SWConsult Logo
BW Logo

 

EaglePeak Consulting Ltd. Registered No. 5799537 England and Wales

Registered Office 35 Badger’s Way, Weston Super Mare, North Somerset. BS24 7ED

Work undertaken for MP Filtri UK Ltd.:-

 

Extension of scope of quality management system to incorporate design, development, manufacturing, calibration and after sales servicing of contamination monitoring products, and the development and control of related software.

 

Development of web browser navigable QMS documentation system.

 

Assistance with establishing compliance to obligations arising from the Waste Electrical and Electronic Equipment (WEEE) directive.

 

MP Filtri Website

Dedicated Contamination Monitoring Products Website

Pall Corporate Website

Work undertaken for Pall Aerospace & Transportation Ltd.:-

 

Implementation of ISO/ TS16949 certified extension to existing Quality Management System to cover activities conducted for the automotive subscribing customer base.

 

Activities included implementation of DFMEA, PFMEA, Control Plans and Measurement Systems analysis in accordance with current automotive (AIAG) guidelines, in addition to modifications to the Quality Management System and its implementation in practise to meet the sector specific requirements.

 

Certification was achieved on the 29th April 2008. The management of the plant expressed a high level of satisfaction with the successful delivery of the project.